Completed projects in Bulgaria

“Preparation of feasibility studies, preliminary design, Detailed Development Plan, and preparation of expropriation procedures for the project “Construction of intermodal terminal in the North Central Planning Region of Bulgaria – Ruse”

Implementation period: 01.2015-12.2015       The project is based on the revised policy for the construction of the Trans-European Transport Network (TEN-T) and aims to improve intermodality in the south-eastern region of the EU, by creating conditions for optimal interaction and integration of different modes of transport and improving the quality of freight transport services provided. […]

“Preparation of feasibility studies, preliminary design, Detailed Development Plan, and preparation of expropriation procedures for the project “Construction of intermodal terminal in the North Central Planning Region of Bulgaria – Ruse” Read More »

“Preparation of Detailed Development Plan and Technical Designs for the project “Modernisation of Sofia – Plovdiv railway line: Sofia – Elin Pelin and Elin Pelin – Septemvri railway sections”, Lot No 3 “Preparation of Detailed Development Plan and Technical Designs for the project “Modernisation of Sofia – Plovdiv railway line: Sofia – Elin Pelin and Elin Pelin – Septemvri railway sections”, for Ihtiman – Septemvri section”

Implementation period: 01.2015-05.2020      In line with the main objectives of the European Cohesion Policy, the National Strategic Reference Framework (NSRF) of Bulgaria defines the main policy objectives and development priorities for the programme period 2007-2013 to establish Bulgaria as a competitive EU Member State. One of the main aspects in railway infrastructure projects defined

“Preparation of Detailed Development Plan and Technical Designs for the project “Modernisation of Sofia – Plovdiv railway line: Sofia – Elin Pelin and Elin Pelin – Septemvri railway sections”, Lot No 3 “Preparation of Detailed Development Plan and Technical Designs for the project “Modernisation of Sofia – Plovdiv railway line: Sofia – Elin Pelin and Elin Pelin – Septemvri railway sections”, for Ihtiman – Septemvri section” Read More »

„Pre-investment study update and elaboration of the investment detailed design for parts of the project “Doubling and electrification of Karnobat – Sindel railway line”

Implementation period: 08.2018-01.2019     The existing Karnobat – Sindel railway line has been in operation for more than sixty years as a single electrified railway line. The alignment along Karnobat – Sindel route is 123 km long and consists of 15 open track sections. By 2004, Karnobat – Sindel railway line was doubled and electrified

„Pre-investment study update and elaboration of the investment detailed design for parts of the project “Doubling and electrification of Karnobat – Sindel railway line” Read More »

“Updating of the preliminary design and preparation of a Detailed Development Plan, Zoning Plan and Plot Plan and technical design of Vidin – Medkovets railway section under the project: “Design for the construction of Vidin– Sofia railway line: project update and preparation of Vidin – Medkovets railway section”

Implementation period: 01.2015-06.2020       The investment project “Modernisation of Vidin-Sofia railway line” provides for the construction of a high speed rail to serve the population, domestic and international freight traffic. The project will ensure interoperability of infrastructure, equipment, control, operation and safety systems, as well as connectivity with European rail networks through the application of

“Updating of the preliminary design and preparation of a Detailed Development Plan, Zoning Plan and Plot Plan and technical design of Vidin – Medkovets railway section under the project: “Design for the construction of Vidin– Sofia railway line: project update and preparation of Vidin – Medkovets railway section” Read More »