Completed projects in Foreign countries

“Preparation of technical documentation at study and conceptual design level for railway line of corridor VIII, section: Kichevo – border with the Republic of Albania”

Implementation period: 05.2009 – 06.2010         The railway line from Kicevo to the Albanian border is part of the Pan-European Corridor VIII, which connects Albania, North Macedonia and Bulgaria and is the only railway link from the Black Sea to the Adriatic Sea (from the port of Durres to the port of Varna). In North …

“Preparation of technical documentation at study and conceptual design level for railway line of corridor VIII, section: Kichevo – border with the Republic of Albania” Read More »

“Macedonian Railways: Corridor X – Preparation of design and implementation of works under the project for railway sections of Corridor X, including Xd branch”

         Implementation period: 05.2012 – 08.2014          The railway Corridor X through the Republic of North Macedonia (215 km) operates as a single-track electrified railway line. The project is prepared to meet the demand of better railway connections along the international corridor in order to increase its capacity and for better connectivity of North Macedonia …

“Macedonian Railways: Corridor X – Preparation of design and implementation of works under the project for railway sections of Corridor X, including Xd branch” Read More »

“Macedonian Railways: Corridor VIII – Eastern Section, Detailed Design and Technical Assistance for Kumanovo – Beljakovce Section”

    Implementation period: 03.2012 – 10.2013     The construction of the railway line between the Republic of North Macedonia and Bulgaria, i.e. from Kumanovo to the border with Bulgaria and Deve Bair – Gyeshevo Border Checkpoint, has been and still is an ongoing topic in the relations between the two countries. The construction of Corridor …

“Macedonian Railways: Corridor VIII – Eastern Section, Detailed Design and Technical Assistance for Kumanovo – Beljakovce Section” Read More »