<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Completed projects in Bulgaria Архиви - „ЕВРОТРАНСПРОЕКТ“ ООД</title>
	<atom:link href="https://eurotransproject.com/en/completed-projects-in-bulgaria/feed/" rel="self" type="application/rss+xml" />
	<link>https://eurotransproject.com/en/completed-projects-in-bulgaria/</link>
	<description>Проектантски и консултантски услуги в областта на железопътния транспорт</description>
	<lastBuildDate>Wed, 05 Apr 2023 07:45:55 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://eurotransproject.com/wp-content/uploads/2019/11/logo_bkg-150x40.png</url>
	<title>Completed projects in Bulgaria Архиви - „ЕВРОТРАНСПРОЕКТ“ ООД</title>
	<link>https://eurotransproject.com/en/completed-projects-in-bulgaria/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>&#8220;Pre-investment study for the project: doubling of the Karnobat-Sindel railway line&#8221;</title>
		<link>https://eurotransproject.com/en/pre-investment-study-for-the-project-doubling-of-the-karnobat-sindel-railway-line/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 15 Feb 2023 08:17:46 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=1874</guid>

					<description><![CDATA[<p>Implementation period: 04.2008-02.2009 &#160;&#160;&#160;&#160;&#160;&#160; &#160;Karnobat &#8211; Sindel railway line is part of the Pan-European Corridor No 8, the alignment is well prepared in terms of design. Together with the rehabilitation of Pyce &#8211; Varna railway line, the section to Karnobat can provide a faster connection to the south of the country. This, in turn, is [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/pre-investment-study-for-the-project-doubling-of-the-karnobat-sindel-railway-line/">&#8220;Pre-investment study for the project: doubling of the Karnobat-Sindel railway line&#8221;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 04.2008-02.2009</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;Karnobat &#8211; Sindel railway line is part of the Pan-European Corridor No 8, the alignment is well prepared in terms of design.</p>



<p>Together with the rehabilitation of Pyce &#8211; Varna railway line, the section to Karnobat can provide a faster connection to the south of the country. This, in turn, is a prerequisite for attracting additional cargo in the event of a tunnel under the Bosphorus. The construction of the railway line between Karnobat and Sindel started in 1981.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The contract was executed in the following stages:</p>



<p>Stage I &#8211; Preparation of a methodology and organisational programme for the implementation of the project, including a schedule for the implementation of the individual stages and phases.</p>



<p>Stage II &#8211; Preparation of a technical status analysis of the existing project.</p>



<p>Stage III &#8211; Preparation of a priority design programme by sections.</p>



<p>Stage IV &#8211; Preparation of a Cost-Benefit Analysis and Financial Efficiency Analysis of the project.</p>



<p>Stage V &#8211; Assessment of the feasibility of using PPPs.</p>



<p>Stage VI – Detailed designs by sections and elements of the railway track.</p>



<p>Stage VII &#8211; Preparation of the Final Report.</p>



<p>&nbsp; The total length of the section is 123 km. The study and design was comprehensive and included all parts of the infrastructure.</p>


<style>.uid-37e233fad5053fe0  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-37e233fad5053fe0  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-37e233fad5053fe0" data-gt3pg-block="grid" data-index="1" class="gt3-photo-gallery-pro--isotope_gallery uid-37e233fad5053fe0 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-37e233fad5053fe0&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 13 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1654,&quot;width&quot;:1181,&quot;height&quot;:896},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 13 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1655,&quot;width&quot;:1151,&quot;height&quot;:493}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:1}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 13 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1654,&quot;width&quot;:1181,&quot;height&quot;:896},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 13 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1655,&quot;width&quot;:1151,&quot;height&quot;:493}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-768x583.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img fetchpriority="high" decoding="async" width="768" height="583" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-768x583.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-768x583.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-300x228.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-768x583.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAA6CAYAAAD1LtTJAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAKElEQVR42u3BMQEAAADCoPVPbQwfoAAAAAAAAAAAAAAAAAAAAAAA+BhGAgABzEAFTQAAAABJRU5ErkJggg==" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-768x329.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img decoding="async" width="768" height="329" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-768x329.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-768x329.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-300x128.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-768x329.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAhCAYAAACcPyaRAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAIUlEQVRo3u3BMQEAAADCoPVPbQ0PoAAAAAAAAAAAAIALAyfVAAHgjDmiAAAAAElFTkSuQmCC" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-37e233fad5053fe0">{"id":1,"uid":"uid-37e233fad5053fe0","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1.jpg","title":"proekt 13 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1654,"width":1181,"height":896},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2.jpg","title":"proekt 13 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1655,"width":1151,"height":493}],"lightbox":{"enable":true,"options":{"instance":1}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1.jpg","title":"proekt 13 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1654,"width":1181,"height":896},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2.jpg","title":"proekt 13 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1655,"width":1151,"height":493}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/pre-investment-study-for-the-project-doubling-of-the-karnobat-sindel-railway-line/">&#8220;Pre-investment study for the project: doubling of the Karnobat-Sindel railway line&#8221;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Increasing the throughput capacity by improving the parameters of the railway track and increasing the design speeds of Sofia-Karlovo-Zimnitsa railway line, Sofia-Karlovo section”</title>
		<link>https://eurotransproject.com/en/increasing-the-throughput-capacity-by-improving-the-parameters-of-the-railway-track-and-increasing-the-design-speeds-of-sofia-karlovo-zimnitsa-railway-line-sofia-karlovo-section/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:38:14 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2083</guid>

					<description><![CDATA[<p>Implementation period: 12.2006 – 09.2007 &#160;&#160;&#160;&#160; The length of the section under consideration is 150 km. A comprehensive study was carried out on all parts of the infrastructure. It included analysis of the existing condition, technical design and preparation of tender documents. &#160;&#160;&#160;&#160; Upon completion of the entire project, a design speed of 100-120 ĸm/h [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/increasing-the-throughput-capacity-by-improving-the-parameters-of-the-railway-track-and-increasing-the-design-speeds-of-sofia-karlovo-zimnitsa-railway-line-sofia-karlovo-section/">&lt;strong&gt;“Increasing the throughput capacity by improving the parameters of the railway track and increasing the design speeds of Sofia-Karlovo-Zimnitsa railway line, Sofia-Karlovo section”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 12.2006 – 09.2007</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; The length of the section under consideration is 150 km. A comprehensive study was carried out on all parts of the infrastructure. It included analysis of the existing condition, technical design and preparation of tender documents.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; Upon completion of the entire project, a design speed of 100-120 ĸm/h will be achieved. The new features included: 25 ĸV/50 Nz electrification, new integrated dispatching system, modernisation of the safety equipment and telecommunications, the rail transport time will be reduced by about 25%. Sofia &#8211; Karlovo &#8211; Zimnica line is one of the busiest railway lines in Bulgaria.</p>


<style>.uid-232bfbbc0ff4849c  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-232bfbbc0ff4849c  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-232bfbbc0ff4849c" data-gt3pg-block="grid" data-index="2" class="gt3-photo-gallery-pro--isotope_gallery uid-232bfbbc0ff4849c gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-232bfbbc0ff4849c&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 14 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1658,&quot;width&quot;:891,&quot;height&quot;:681},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 14 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1659,&quot;width&quot;:1920,&quot;height&quot;:563}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:2}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 14 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1658,&quot;width&quot;:891,&quot;height&quot;:681},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 14 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1659,&quot;width&quot;:1920,&quot;height&quot;:563}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-768x587.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img decoding="async" width="768" height="587" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-768x587.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-768x587.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-300x229.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-768x587.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAA6CAYAAAD1LtTJAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAKElEQVR42u3BMQEAAADCoPVPbQwfoAAAAAAAAAAAAAAAAAAAAAAA+BhGAgABzEAFTQAAAABJRU5ErkJggg==" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-768x225.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="225" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-768x225.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-768x225.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-300x88.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-768x225.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAWCAYAAACFQBGEAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAHUlEQVRYw+3BMQEAAADCoPVPbQo/oAAAAAAAAOBlGo4AARvkOzMAAAAASUVORK5CYII=" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-232bfbbc0ff4849c">{"id":1,"uid":"uid-232bfbbc0ff4849c","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1.jpg","title":"proekt 14 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1658,"width":891,"height":681},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2.jpg","title":"proekt 14 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1659,"width":1920,"height":563}],"lightbox":{"enable":true,"options":{"instance":2}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1.jpg","title":"proekt 14 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1658,"width":891,"height":681},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2.jpg","title":"proekt 14 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1659,"width":1920,"height":563}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/increasing-the-throughput-capacity-by-improving-the-parameters-of-the-railway-track-and-increasing-the-design-speeds-of-sofia-karlovo-zimnitsa-railway-line-sofia-karlovo-section/">&lt;strong&gt;“Increasing the throughput capacity by improving the parameters of the railway track and increasing the design speeds of Sofia-Karlovo-Zimnitsa railway line, Sofia-Karlovo section”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Technical assistance for the development of Sofia Railway Junction”</title>
		<link>https://eurotransproject.com/en/technical-assistance-for-the-development-of-sofia-railway-junction/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:34:50 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2090</guid>

					<description><![CDATA[<p>Implementation period: 11.2009-12.2010 &#160;&#160;&#160;&#160;&#160;&#160; Sofia Railway Junction is located on the Orient/East-Med Corridor of the main TEN-T network, making it the largest rail transport hub in the country. The activities carried out for Sofia Railway Junction include preparation of technical designs and detailed development plans (DDP) for modernisation and rehabilitation of individual sections of Sofia [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-development-of-sofia-railway-junction/">&lt;strong&gt;“Technical assistance for the development of Sofia Railway Junction”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 11.2009-12.2010</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sofia Railway Junction is located on the Orient/East-Med Corridor of the main TEN-T network, making it the largest rail transport hub in the country. The activities carried out for Sofia Railway Junction include preparation of technical designs and detailed development plans (DDP) for modernisation and rehabilitation of individual sections of Sofia Railway Junction, reconstruction of existing and construction of new station buildings, halts and buildings within its scope.</p>



<p>&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Sofia Railway Junction covers the sections between the stations Voluyak &#8211; Kazichene, Kazichene &#8211; Stolnik, Zaharna Fabrika &#8211; Sofia &#8211; Kurilo and Birimirtsi station. Under the project “Instrument for preparation of railway projects for the Trans-European Transport Network” technical designs and DDP were prepared for the following stations and the railway sections between them: Voluyak, Sofia Central Railway Station, Poduyane, Poduyane Shunting Yard, Iskar, Kazichene, Stolnik, Sofia -north, Iliantsi, Birimirtsi and the open track section Kazichene &#8211; Elin Pelin. The only part of Sofia Railway Junction that is included in Sofia &#8211; Elin Pelin railway line modernisation project is the section of the same name, which is currently in the stage of implementation. Essentially, within the framework of Sofia Railway Junction development project, a third railway track will be designed in the section from Volyak station to Elin Pelin station, which will be dedicated to freight traffic. In addition to Sofia &#8211; Volyuyak project, the switch layout in Sofia Central Railway Station will be optimised and reconstructed. Following a direct application, the European Commission has approved funding for the implementation of several new projects under the Connecting Europe Facility (CEF). Among them is the project for the modernisation of Sofia-Volujak railway section, which is part of Sofia Railway Junction.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The project is funded by the ISPA/CF programme, Regulation 1164/94 with the funds saved under the Financing Memorandum “Technical assistance for the Modernisation of Trans-European Transport Network (TEN-T) railway lines in Bulgaria”. Its implementation provided the necessary project readiness to apply for funding and implement construction works under the Operational Programme on Transport.</p>


<style>.uid-387088a3eae051a6  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-387088a3eae051a6  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-387088a3eae051a6" data-gt3pg-block="grid" data-index="3" class="gt3-photo-gallery-pro--isotope_gallery uid-387088a3eae051a6 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-387088a3eae051a6&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 12 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1651,&quot;width&quot;:1178,&quot;height&quot;:622}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:3}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 12 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1651,&quot;width&quot;:1178,&quot;height&quot;:622}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-768x406.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="406" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-768x406.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-768x406.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-300x158.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-768x406.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAoCAYAAAC7MHdZAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAIklEQVRo3u3BAQEAAACCIP+vbkhAAQAAAAAAAAAAAAAALwYwSAABNsr1wQAAAABJRU5ErkJggg==" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-387088a3eae051a6">{"id":1,"uid":"uid-387088a3eae051a6","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1.jpg","title":"proekt 12 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1651,"width":1178,"height":622}],"lightbox":{"enable":true,"options":{"instance":3}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1.jpg","title":"proekt 12 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1651,"width":1178,"height":622}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-development-of-sofia-railway-junction/">&lt;strong&gt;“Technical assistance for the development of Sofia Railway Junction”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Technical assistance for the restoration of the design parameters of Ruse &#8211; Varna railway line”</title>
		<link>https://eurotransproject.com/en/technical-assistance-for-the-restoration-of-the-design-parameters-of-ruse-varna-railway-line/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:33:10 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2092</guid>

					<description><![CDATA[<p>Implementation period: 02.2009-09.2011 &#160;&#160;&#160;&#160; The main objective of the project is to provide technical assistance to Bulgaria for the development of the railway infrastructure in line with the European Union policy. It will help fulfil the commitments made for the sustainable development of the Trans-European Transport Networks (TEN-T). &#160;&#160;&#160; Ruse &#8211; Varna railway section is [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-restoration-of-the-design-parameters-of-ruse-varna-railway-line/">&lt;strong&gt;“Technical assistance for the restoration of the design parameters of Ruse &#8211; Varna railway line”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 02.2009-09.2011</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; The main objective of the project is to provide technical assistance to Bulgaria for the development of the railway infrastructure in line with the European Union policy. It will help fulfil the commitments made for the sustainable development of the Trans-European Transport Networks (TEN-T).</p>



<p>&nbsp;&nbsp;&nbsp; Ruse &#8211; Varna railway section is electrified and has an approximate length of 232 km. It consists of two sections: Ruse &#8211; Kaspichan &#8211; main railway line No 9 &#8211; first category, 97 km long, single-track electrified section; and Kaspichan &#8211; Varna, 135 km long, double-track electrified section, which is part of main railway line No 2 Sofia-Mezdra-Gorna Oryahovitsa-Kaspichan-Sindel-Varna. The current state of the infrastructure facilities on this railway section obstructs regional rail transport. Thus, Ruse-Varna railway section can be defined as a bottleneck, as the estimated average speed is 66.5 km/h for passenger trains and 62 km/h for freight trains, at an average design speed for the section of 79.3 km/h. The railway line is an important section that provides a link between the ports of Ruse and Varna. The developed preliminary and technical designs for the rehabilitation of the railway line enable the project to be implemented and the railway sections Ruse-Kaspichan and Kaspichan-Varna to be brought in line with the requirements of the Technical Specifications for Interoperability, if a contractor is selected for the construction works.</p>


<style>.uid-251b07b7b33c277b  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-251b07b7b33c277b  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-251b07b7b33c277b" data-gt3pg-block="grid" data-index="4" class="gt3-photo-gallery-pro--isotope_gallery uid-251b07b7b33c277b gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-251b07b7b33c277b&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 11 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1647,&quot;width&quot;:1230,&quot;height&quot;:924},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 11 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1648,&quot;width&quot;:1814,&quot;height&quot;:1080}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:4}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 11 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1647,&quot;width&quot;:1230,&quot;height&quot;:924},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 11 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1648,&quot;width&quot;:1814,&quot;height&quot;:1080}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-768x577.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="577" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-768x577.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-768x577.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-300x225.jpg 300w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-600x450.jpg 600w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-768x577.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAA5CAYAAABzuqZnAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAKElEQVR42u3BMQEAAADCoPVPbQlPoAAAAAAAAAAAAAAAAAAAAAAADgZEzQABzhJDggAAAABJRU5ErkJggg==" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-768x457.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="457" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-768x457.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-768x457.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-300x179.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-768x457.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAtCAYAAADr/ebqAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAI0lEQVRo3u3BAQEAAACCIP+vbkhAAQAAAAAAAAAAAAAAAHBhNlEAAVcoBHMAAAAASUVORK5CYII=" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-251b07b7b33c277b">{"id":1,"uid":"uid-251b07b7b33c277b","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1.jpg","title":"proekt 11 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1647,"width":1230,"height":924},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2.jpg","title":"proekt 11 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1648,"width":1814,"height":1080}],"lightbox":{"enable":true,"options":{"instance":4}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1.jpg","title":"proekt 11 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1647,"width":1230,"height":924},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2.jpg","title":"proekt 11 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1648,"width":1814,"height":1080}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-restoration-of-the-design-parameters-of-ruse-varna-railway-line/">&lt;strong&gt;“Technical assistance for the restoration of the design parameters of Ruse &#8211; Varna railway line”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Technical assistance for the renewal and reconstruction of Plovdiv-Mihailovo railway section”</title>
		<link>https://eurotransproject.com/en/technical-assistance-for-the-renewal-and-reconstruction-of-plovdiv-mihailovo-railway-section/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:31:33 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2094</guid>

					<description><![CDATA[<p>Implementation period: 04.2010-12.2010 &#160;&#160;&#160;&#160; The renewal and reconstruction of Plovdiv &#8211; Mihailovo railway section is essential for the completion of the rehabilitation of Plovdiv &#8211; Burgas railway line. Plovdiv-Mihailovo railway section is part of the VIII railway line Plovdiv-Burgas, which is part of the TlNA network (according to the Ordinance on the categorisation of railway [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-renewal-and-reconstruction-of-plovdiv-mihailovo-railway-section/">&lt;strong&gt;“Technical assistance for the renewal and reconstruction of Plovdiv-Mihailovo railway section”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 04.2010-12.2010</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; The renewal and reconstruction of Plovdiv &#8211; Mihailovo railway section is essential for the completion of the rehabilitation of Plovdiv &#8211; Burgas railway line. Plovdiv-Mihailovo railway section is part of the VIII railway line Plovdiv-Burgas, which is part of the TlNA network (according to the Ordinance on the categorisation of railway lines in the Republic of Bulgaria included in the railway infrastructure and the closure of individual lines or parts of lines (prom. State Gazette No 112 of 2001) it has the status of a high speed rail) and is a link between the Pan-European Corridors IV and VIII.</p>



<p>The implementation of the project covers the preparation of a technical design, a strategy for phased implementation and other activities divided into two lots:</p>



<p>Lot 1: Rehabilitation of Skutare-Orizovo railway section with a total length of about 27 km.</p>



<p>Lot 2: Rehabilitation of the energy facilities in Plovdiv-Orizovo section with a total length of about 44 km.</p>



<p>The project also contributed to the implementation of the following international agreements and initiatives:</p>



<p>Trans-European Networks (TEN);</p>



<p>European Agreement on Main International Railway Lines (АGС);</p>



<p>European Agreement on Important International Combined Transport Lines (AGTC);</p>



<p>Trans-European Railway (ТЕR).</p>



<p>Memoranda on European transport corridors Nos V, VIII, IХ, Х.</p>


<style>.uid-8772045ed73a8074  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-8772045ed73a8074  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-8772045ed73a8074" data-gt3pg-block="grid" data-index="5" class="gt3-photo-gallery-pro--isotope_gallery uid-8772045ed73a8074 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-8772045ed73a8074&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 10 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1643,&quot;width&quot;:1295,&quot;height&quot;:509},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 10 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1644,&quot;width&quot;:1920,&quot;height&quot;:662}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:5}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 10 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1643,&quot;width&quot;:1295,&quot;height&quot;:509},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 10 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1644,&quot;width&quot;:1920,&quot;height&quot;:662}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.1-768x302.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="302" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.1-768x302.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.1-768x302.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.1-300x118.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.1-768x302.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAeCAYAAABpE5PpAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAH0lEQVRo3u3BAQEAAACCIP+vbkhAAQAAAAAAAAAAXwYkNgABZD3MZgAAAABJRU5ErkJggg==" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.2-768x265.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="265" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.2-768x265.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.2-768x265.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.2-300x103.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-10-sn.2-768x265.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAaCAYAAADygtH/AAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAH0lEQVRYw+3BgQAAAADDoPlTH+ECVQEAAAAAAAAA3wAfYgABJoU83AAAAABJRU5ErkJggg==" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-8772045ed73a8074">{"id":1,"uid":"uid-8772045ed73a8074","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.1.jpg","title":"proekt 10 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1643,"width":1295,"height":509},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.2.jpg","title":"proekt 10 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1644,"width":1920,"height":662}],"lightbox":{"enable":true,"options":{"instance":5}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.1.jpg","title":"proekt 10 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1643,"width":1295,"height":509},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.2.jpg","title":"proekt 10 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-10-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1644,"width":1920,"height":662}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-renewal-and-reconstruction-of-plovdiv-mihailovo-railway-section/">&lt;strong&gt;“Technical assistance for the renewal and reconstruction of Plovdiv-Mihailovo railway section”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Design and construction of a combined transport terminal at Dragoman station”</title>
		<link>https://eurotransproject.com/en/design-and-construction-of-a-combined-transport-terminal-at-dragoman-station/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:28:42 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2096</guid>

					<description><![CDATA[<p>Implementation period: 05.2010-11.2010 &#160;&#160;&#160;&#160;&#160; The construction of the terminal is part of the strategy of the Ministry of Transport, Information Technology and Communications to accelerate the implementation of infrastructure projects that will increase the competitiveness of rail transport in the country. The development of combined transport will lead to an increase in the volume of [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/design-and-construction-of-a-combined-transport-terminal-at-dragoman-station/">&lt;strong&gt;“Design and construction of a combined transport terminal at Dragoman station”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 05.2010-11.2010</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The construction of the terminal is part of the strategy of the Ministry of Transport, Information Technology and Communications to accelerate the implementation of infrastructure projects that will increase the competitiveness of rail transport in the country. The development of combined transport will lead to an increase in the volume of rail freight transport, which is crucial to improve the current status of the Bulgarian State Railways.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The terminal was built in the area of the former ice point at Dragoman station. It includes two tracks, two side tracks used for loading and unloading with an operating length of 300 m, connected to Dragoman station, each track allowing for the service of 26 10-axle low railwagons. The completed works included: link road of the terminal with road 81114; manoeuvring area for boarding and disembarking Ro-La railwagons; area for emergency manoeuvring of motor vehicles; TIR-car park for 25 vehicles; lane-changing area with the possibility of short-term parking for 6 TIRs; extensions for emergency parking or passing other vehicles; service car park for mobile ramps, lifting equipment, cars, and light trucks; floodlighting of the terminal; mobile ramps, etc.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The aim is to ensure that heavy goods vehicles travelling from Europe to Turkey and the Middle East do not travel through the entire national road network, but be loaded onto trains at Dragoman station. A car park was built for waiting trucks to avoid congestion. Access to the terminal is provided by a link road from the existing international road to Kalotina, and the terminal itself can be accessed via a specially built bypass route.</p>


<style>.uid-f376b747dd166089  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-f376b747dd166089  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-f376b747dd166089" data-gt3pg-block="grid" data-index="6" class="gt3-photo-gallery-pro--isotope_gallery uid-f376b747dd166089 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-f376b747dd166089&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 9 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1638,&quot;width&quot;:1296,&quot;height&quot;:490},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 9 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1639,&quot;width&quot;:1920,&quot;height&quot;:637}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:6}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 9 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1638,&quot;width&quot;:1296,&quot;height&quot;:490},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 9 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1639,&quot;width&quot;:1920,&quot;height&quot;:637}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.1-768x290.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="290" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.1-768x290.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.1-768x290.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.1-300x113.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.1-768x290.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAdCAYAAADvh+FHAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAIElEQVRo3u3BAQ0AAADCoPdPbQ43oAAAAAAAAAAA4NgAIwEAAYousqgAAAAASUVORK5CYII=" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.2-768x255.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="255" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.2-768x255.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.2-768x255.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.2-300x100.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-9-sn.2-768x255.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAZCAYAAAB0FqNRAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAHUlEQVRYw+3BAQEAAACCIP+vbkhAAQAAAAAAAHBnHi0AAY3ujCkAAAAASUVORK5CYII=" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-f376b747dd166089">{"id":1,"uid":"uid-f376b747dd166089","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.1.jpg","title":"proekt 9 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1638,"width":1296,"height":490},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.2.jpg","title":"proekt 9 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1639,"width":1920,"height":637}],"lightbox":{"enable":true,"options":{"instance":6}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.1.jpg","title":"proekt 9 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1638,"width":1296,"height":490},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.2.jpg","title":"proekt 9 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-9-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1639,"width":1920,"height":637}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/design-and-construction-of-a-combined-transport-terminal-at-dragoman-station/">&lt;strong&gt;“Design and construction of a combined transport terminal at Dragoman station”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Technical assistance for the development of Burgas junction”</title>
		<link>https://eurotransproject.com/en/technical-assistance-for-the-development-of-burgas-junction/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:26:18 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2098</guid>

					<description><![CDATA[<p>Implementation period: 04.2010-12.2010 &#160;&#160;&#160;&#160; The implementation of the project is the first step towards the optimisation of the existing infrastructure related to railway network safety and the improvement of the operational railway process in Burgas region in accordance with European standards and transport policy. &#160;&#160;&#160;&#160; Burgas Railway Junction belongs to the south-eastern axis defined in [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-development-of-burgas-junction/">&lt;strong&gt;“Technical assistance for the development of Burgas junction”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 04.2010-12.2010</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; The implementation of the project is the first step towards the optimisation of the existing infrastructure related to railway network safety and the improvement of the operational railway process in Burgas region in accordance with European standards and transport policy.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; Burgas Railway Junction belongs to the south-eastern axis defined in the 2005 report of the High- Level Group chaired by Loyola de Palacio for the extension of the main trans-European axes to neighbouring countries and regions. The connection to Plovdiv-Sofia (III railway line), Karlovo-Sofia/Varna (III railway line) routes, which are part of the TINA network, the development of which is a very high priority for the Ministry of Transport, Information Technology and Communications in terms of transport infrastructure development, is carried out through Burgas-Karnobat section. The project also contributed to the implementation of the following international agreements and initiatives:</p>



<p>Trans-European Networks (TEN);</p>



<p>European Agreement on Main International Railway Lines (АGС);</p>



<p>European Agreement on Important International Combined Transport Lines (AGTC);</p>



<p>Trans-European Railway (ТЕR).</p>


<style>.uid-2a47cc83cfbb4de0  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-2a47cc83cfbb4de0  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-2a47cc83cfbb4de0" data-gt3pg-block="grid" data-index="7" class="gt3-photo-gallery-pro--isotope_gallery uid-2a47cc83cfbb4de0 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-2a47cc83cfbb4de0&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 8 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1634,&quot;width&quot;:1227,&quot;height&quot;:297},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 8 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1635,&quot;width&quot;:1593,&quot;height&quot;:1080}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:7}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 8 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1634,&quot;width&quot;:1227,&quot;height&quot;:297},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 8 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1635,&quot;width&quot;:1593,&quot;height&quot;:1080}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.1-768x186.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="186" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.1-768x186.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.1-768x186.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.1-300x73.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.1-768x186.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAASCAYAAAAe0VOSAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAHElEQVRYw+3BMQEAAADCoPVPbQ0PoAAAAAAA+DIVugAB4vSwfwAAAABJRU5ErkJggg==" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.2-768x521.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="521" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.2-768x521.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.2-768x521.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.2-300x203.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-8-sn.2-768x521.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAA0CAYAAADPJLW5AAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAJklEQVRo3u3BMQEAAADCoPVPbQlPoAAAAAAAAAAAAAAAAAAAAOBjPsQAAWkYmjAAAAAASUVORK5CYII=" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-2a47cc83cfbb4de0">{"id":1,"uid":"uid-2a47cc83cfbb4de0","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.1.jpg","title":"proekt 8 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1634,"width":1227,"height":297},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.2.jpg","title":"proekt 8 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1635,"width":1593,"height":1080}],"lightbox":{"enable":true,"options":{"instance":7}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.1.jpg","title":"proekt 8 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1634,"width":1227,"height":297},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.2.jpg","title":"proekt 8 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-8-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1635,"width":1593,"height":1080}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-development-of-burgas-junction/">&lt;strong&gt;“Technical assistance for the development of Burgas junction”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Mechanised renewal of the railway track in Raduntsi &#8211; Dubovo open track section with a length of 3,503.50 m, repair of steel bridges at km 215+355 and strengthening of tunnels No 23, 24 and 25 along the 4th railway line”</title>
		<link>https://eurotransproject.com/en/mechanised-renewal-of-the-railway-track-in-raduntsi-dubovo-open-track-section-with-a-length-of-3503-50-m-repair-of-steel-bridges-at-km-215355-and-strengthening-of-tunnels-no-23-24-and-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:21:31 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2101</guid>

					<description><![CDATA[<p>Implementation period: 02.2011-12.2011 The following activities were carried out within the investment project:</p>
<p>Материалът <a href="https://eurotransproject.com/en/mechanised-renewal-of-the-railway-track-in-raduntsi-dubovo-open-track-section-with-a-length-of-3503-50-m-repair-of-steel-bridges-at-km-215355-and-strengthening-of-tunnels-no-23-24-and-2/">&lt;strong&gt;“Mechanised renewal of the railway track in Raduntsi &#8211; Dubovo open track section with a length of 3,503.50 m, repair of steel bridges at km 215+355 and strengthening of tunnels No 23, 24 and 25 along the 4th railway line”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 02.2011-12.2011</p>



<p>The following activities were carried out within the investment project:</p>



<ul class="wp-block-list">
<li>surveying of the site;</li>



<li>preparation of detailed design for the following parts: Railway track, Drainage, Tunnels (tunnel No 23 with a length of 1,100 m, tunnel No 24 with a length of 788 m, and tunnel No 25 with a length of 623 m), Railway bridges (the bridge at km 215+452 with a length of 10.4 m and the bridge at km 216+355 with a length of 11 m), Safety equipment and telecommunications, Surveying, Catenary and power supply, Engineering and geological survey, Health and Safety Plan and Fire safety.</li>



<li>preparation of technical specifications;</li>



<li>carrying out author’s supervision;</li>
</ul>


<style>.uid-5a84e805cb29a0f7  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-5a84e805cb29a0f7  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-5a84e805cb29a0f7" data-gt3pg-block="grid" data-index="8" class="gt3-photo-gallery-pro--isotope_gallery uid-5a84e805cb29a0f7 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-5a84e805cb29a0f7&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 7 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1629,&quot;width&quot;:1262,&quot;height&quot;:608},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.3.jpg&quot;,&quot;title&quot;:&quot;proekt 7 sn.3&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.3-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1630,&quot;width&quot;:1920,&quot;height&quot;:1076}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:8}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 7 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1629,&quot;width&quot;:1262,&quot;height&quot;:608},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.3.jpg&quot;,&quot;title&quot;:&quot;proekt 7 sn.3&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.3-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1630,&quot;width&quot;:1920,&quot;height&quot;:1076}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.1-768x370.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="370" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.1-768x370.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.1-768x370.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.1-300x145.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.1-768x370.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAlCAYAAAAHrmSHAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAIklEQVRo3u3BMQEAAADCoPVPbQlPoAAAAAAAAAAAAAAAzgYsqQABqu9C6gAAAABJRU5ErkJggg==" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.3-768x430.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="430" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.3-768x430.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.3-768x430.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.3-300x168.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-7-sn.3-768x430.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAArCAYAAAA9pAX3AAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAJElEQVRo3u3BMQEAAADCoPVPbQwfoAAAAAAAAAAAAAAAAICzATPnAAGZbRrQAAAAAElFTkSuQmCC" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-5a84e805cb29a0f7">{"id":1,"uid":"uid-5a84e805cb29a0f7","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.1.jpg","title":"proekt 7 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1629,"width":1262,"height":608},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.3.jpg","title":"proekt 7 sn.3","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.3-150x150.jpg","description":"","is_video":0,"image_id":1630,"width":1920,"height":1076}],"lightbox":{"enable":true,"options":{"instance":8}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.1.jpg","title":"proekt 7 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1629,"width":1262,"height":608},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.3.jpg","title":"proekt 7 sn.3","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-7-sn.3-150x150.jpg","description":"","is_video":0,"image_id":1630,"width":1920,"height":1076}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/mechanised-renewal-of-the-railway-track-in-raduntsi-dubovo-open-track-section-with-a-length-of-3503-50-m-repair-of-steel-bridges-at-km-215355-and-strengthening-of-tunnels-no-23-24-and-2/">&lt;strong&gt;“Mechanised renewal of the railway track in Raduntsi &#8211; Dubovo open track section with a length of 3,503.50 m, repair of steel bridges at km 215+355 and strengthening of tunnels No 23, 24 and 25 along the 4th railway line”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Modernisation of Septemvri-Plovdiv railway section &#8211; part of the Trans-European railway network” Lot 1: Modernisation of Septemvri &#8211; Pazardzhik railway section within the boundaries from the beginning of switch No 2 (km 102+014) along road No 1 and the end of switch No 6 (km 102+070) along road No 2 at the west switch area atSeptemvri station to the end of switch No 5 (km 119+624) along road No 1 and the end of switch No1 (km 119+692) along road No 2 at the east switch area at Pazardzhik station, including Septemvri and Pazardzhik stations”</title>
		<link>https://eurotransproject.com/en/modernisation-of-septemvri-plovdiv-railway-section-part-of-the-trans-european-railway-network-lot-1-modernisation-of-septemvri-pazardzhik-railway-section-within-the-boundaries-f/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:19:03 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2104</guid>

					<description><![CDATA[<p>Implementation period: 09.2011-12.2016 &#160;&#160;&#160;&#160; Sofia-Plovdiv railway line is part of the Trans-European railway network and its modernisation is among the priority projects of the Operational Programme on Transport. Modernisation of Sofia-Plovdiv railway line will provide a link to the project “Doubling and electrification of the railway line Plovdiv-Svilengrad – borders with the Republic of Turkey [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/modernisation-of-septemvri-plovdiv-railway-section-part-of-the-trans-european-railway-network-lot-1-modernisation-of-septemvri-pazardzhik-railway-section-within-the-boundaries-f/">&lt;strong&gt;“Modernisation of Septemvri-Plovdiv railway section &#8211; part of the Trans-European railway network” Lot 1: Modernisation of Septemvri &#8211; Pazardzhik railway section within the boundaries from the beginning of switch No 2 (km 102+014) along road No 1 and the end of switch No 6 (km 102+070) along road No 2 at the west switch area atSeptemvri station to the end of switch No 5 (km 119+624) along road No 1 and the end of switch No1 (km 119+692) along road No 2 at the east switch area at Pazardzhik station, including Septemvri and Pazardzhik stations”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 09.2011-12.2016</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; Sofia-Plovdiv railway line is part of the Trans-European railway network and its modernisation is among the priority projects of the Operational Programme on Transport.</p>



<p>Modernisation of Sofia-Plovdiv railway line will provide a link to the project “Doubling and electrification of the railway line Plovdiv-Svilengrad – borders with the Republic of Turkey and the Republic of Greece”, which is an ongoing project.</p>



<p>The project will also contribute to the implementation of a number of international agreements and initiatives:</p>



<ul class="wp-block-list">
<li>Trans-European Networks (TEN);</li>



<li>European Agreement on Main International Railway Lines (AGC);</li>



<li>European Agreement on Important International Combined Transport Lines (AGTC);</li>



<li>Trans-European Railway (ТЕR).</li>
</ul>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sofia-Plovdiv railway line is part of the first main high speed railway line Kalotina West &#8211; Sofia &#8211; Plovdiv &#8211; Svilengrad &#8211; borders with the Republic of Turkey and the Republic of Greece. Sofia-Plovdiv section is double electrified, with a normal track gauge of 1,435 mm and a total length of 156 km.</p>


<style>.uid-8c4686981d530323  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-8c4686981d530323  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-8c4686981d530323" data-gt3pg-block="grid" data-index="9" class="gt3-photo-gallery-pro--isotope_gallery uid-8c4686981d530323 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-8c4686981d530323&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 6 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1625,&quot;width&quot;:796,&quot;height&quot;:920},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 6 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1626,&quot;width&quot;:1920,&quot;height&quot;:717}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:9}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 6 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1625,&quot;width&quot;:796,&quot;height&quot;:920},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 6 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1626,&quot;width&quot;:1920,&quot;height&quot;:717}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.1-768x888.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="888" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.1-768x888.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.1-768x888.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.1-260x300.jpg 260w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.1-768x888.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAABZCAYAAAB7Tqk9AAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAMklEQVR42u3BMQEAAADCoPVPbQ0PoAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA4NQAa20AAQgZoooAAAAASUVORK5CYII=" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.2-768x287.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="287" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.2-768x287.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.2-768x287.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.2-300x112.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-6-sn.2-768x287.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAcCAYAAAAk2zLiAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAH0lEQVRo3u3BMQEAAADCoPVPbQ0PoAAAAAAAAAAAeDEhzAABwrPqlAAAAABJRU5ErkJggg==" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-8c4686981d530323">{"id":1,"uid":"uid-8c4686981d530323","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.1.jpg","title":"proekt 6 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1625,"width":796,"height":920},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.2.jpg","title":"proekt 6 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1626,"width":1920,"height":717}],"lightbox":{"enable":true,"options":{"instance":9}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.1.jpg","title":"proekt 6 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1625,"width":796,"height":920},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.2.jpg","title":"proekt 6 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-6-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1626,"width":1920,"height":717}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/modernisation-of-septemvri-plovdiv-railway-section-part-of-the-trans-european-railway-network-lot-1-modernisation-of-septemvri-pazardzhik-railway-section-within-the-boundaries-f/">&lt;strong&gt;“Modernisation of Septemvri-Plovdiv railway section &#8211; part of the Trans-European railway network” Lot 1: Modernisation of Septemvri &#8211; Pazardzhik railway section within the boundaries from the beginning of switch No 2 (km 102+014) along road No 1 and the end of switch No 6 (km 102+070) along road No 2 at the west switch area atSeptemvri station to the end of switch No 5 (km 119+624) along road No 1 and the end of switch No1 (km 119+692) along road No 2 at the east switch area at Pazardzhik station, including Septemvri and Pazardzhik stations”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Technical assistance for the modernisation of Radomir-Kulata railway line”</title>
		<link>https://eurotransproject.com/en/technical-assistance-for-the-modernisation-of-radomir-kulata-railway-line/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:15:16 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2106</guid>

					<description><![CDATA[<p>Implementation period: 02.2013-12.2014 &#160; Vidin-Sofia-Radomir-Kulata railway line is an important element of the Trans-European railway network- Transport Corridor IV and one of the priority axes of the European Commission &#8211; Railway Axis 22: Athens-Sofia-Budapest-Vienna-Prague-Nuremberg/Dresden. Therefore, the modernisation of this section (Radomir-Kulata) is of strategic importance, especially as it is also a border railway section. &#160;&#160;&#160;&#160;&#160; [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-modernisation-of-radomir-kulata-railway-line/">&lt;strong&gt;“Technical assistance for the modernisation of Radomir-Kulata railway line”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 02.2013-12.2014</p>



<p>&nbsp; Vidin-Sofia-Radomir-Kulata railway line is an important element of the Trans-European railway network- Transport Corridor IV and one of the priority axes of the European Commission &#8211; Railway Axis 22: Athens-Sofia-Budapest-Vienna-Prague-Nuremberg/Dresden. Therefore, the modernisation of this section (Radomir-Kulata) is of strategic importance, especially as it is also a border railway section.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;For the purpose of coordination and implementation of the project, a Cooperation Agreement between four countries, Greece, Bulgaria, Romania and Hungary, has been prepared, agreed and signed at the level of “railway infrastructure managers”.</p>



<p>Priority Project 22 (railway) provides for the implementation of preparatory pre-investment studies for pre-approved railway sections in the four countries under the agreement. The subject of the agreement is “Technical assistance for the modernisation of Radomir-Kulata railway line” as part of the “Studies regarding the construction of Priority Project 22 (railway)” on the territory of the Republic of Bulgaria.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;After the implementation of the project the set objectives have been achieved, namely:</p>



<p>Modernised section in accordance with the full requirements for interoperability of infrastructure, facilities, rolling stock, control, operation, and safety systems as required by Directive 2008/57/EC and its subsequent amendments.</p>



<p>Implementation of the European Commission’s policy to develop this main rail corridor and achieve connectivity of transport networks on the basis of common standards.</p>



<p>Increasing the volume of freight transported along the line.</p>



<p>Reducing greenhouse gas emissions and increasing the competitiveness of rail transport.</p>



<p>Achieving economic and social cohesion in the country’s regional development.</p>



<p>Modernisation of a significant infrastructure element of national and international importance for Pan-European transport corridor IV, Rail Freight Corridor 7, and Railway Axis 22.</p>


<style>.uid-3e495e92f4dd291d  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-3e495e92f4dd291d  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-3e495e92f4dd291d" data-gt3pg-block="grid" data-index="10" class="gt3-photo-gallery-pro--isotope_gallery uid-3e495e92f4dd291d gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-3e495e92f4dd291d&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 5 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1620,&quot;width&quot;:1249,&quot;height&quot;:486},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 5 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1621,&quot;width&quot;:1920,&quot;height&quot;:898}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:10}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 5 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1620,&quot;width&quot;:1249,&quot;height&quot;:486},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 5 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1621,&quot;width&quot;:1920,&quot;height&quot;:898}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.1-768x299.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="299" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.1-768x299.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.1-768x299.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.1-300x117.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.1-768x299.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAdCAYAAADvh+FHAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAIElEQVRo3u3BAQ0AAADCoPdPbQ43oAAAAAAAAAAA4NgAIwEAAYousqgAAAAASUVORK5CYII=" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.2-768x359.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="359" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.2-768x359.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.2-768x359.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.2-300x140.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-5-sn.2-768x359.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAjCAYAAADR94eaAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAIElEQVRo3u3BAQEAAACCIP+vbkhAAQAAAAAAAAAAAHBkKj8AAX1GcroAAAAASUVORK5CYII=" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-3e495e92f4dd291d">{"id":1,"uid":"uid-3e495e92f4dd291d","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.1.jpg","title":"proekt 5 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1620,"width":1249,"height":486},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.2.jpg","title":"proekt 5 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1621,"width":1920,"height":898}],"lightbox":{"enable":true,"options":{"instance":10}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.1.jpg","title":"proekt 5 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1620,"width":1249,"height":486},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.2.jpg","title":"proekt 5 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-5-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1621,"width":1920,"height":898}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-modernisation-of-radomir-kulata-railway-line/">&lt;strong&gt;“Technical assistance for the modernisation of Radomir-Kulata railway line”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
