Project

“Modernisation of Septemvri-Plovdiv railway section – part of the Trans-European railway network” Lot 1: Modernisation of Septemvri – Pazardzhik railway section within the boundaries from the beginning of switch No 2 (km 102+014) along road No 1 and the end of switch No 6 (km 102+070) along road No 2 at the west switch area atSeptemvri station to the end of switch No 5 (km 119+624) along road No 1 and the end of switch No1 (km 119+692) along road No 2 at the east switch area at Pazardzhik station, including Septemvri and Pazardzhik stations”

Implementation period: 09.2011-12.2016

     Sofia-Plovdiv railway line is part of the Trans-European railway network and its modernisation is among the priority projects of the Operational Programme on Transport.

Modernisation of Sofia-Plovdiv railway line will provide a link to the project “Doubling and electrification of the railway line Plovdiv-Svilengrad – borders with the Republic of Turkey and the Republic of Greece”, which is an ongoing project.

The project will also contribute to the implementation of a number of international agreements and initiatives:

  • Trans-European Networks (TEN);
  • European Agreement on Main International Railway Lines (AGC);
  • European Agreement on Important International Combined Transport Lines (AGTC);
  • Trans-European Railway (ТЕR).

         Sofia-Plovdiv railway line is part of the first main high speed railway line Kalotina West – Sofia – Plovdiv – Svilengrad – borders with the Republic of Turkey and the Republic of Greece. Sofia-Plovdiv section is double electrified, with a normal track gauge of 1,435 mm and a total length of 156 km.

Contacts

Phone

+359 879 83 73 83

Email

office@eurotransproject.com

Address

1202 Sofia , 108 "Tsar Samuil" Street

Contacts

Phone

+359 879 83 73 83

Email

office@eurotransproject.com

Address

1202 Sofia , 108 "Tsar Samuil" Street