Project

“Increasing the throughput capacity by improving the parameters of the railway track and increasing the design speeds of Sofia-Karlovo-Zimnitsa railway line, Sofia-Karlovo section”

Implementation period: 12.2006 – 09.2007

     The length of the section under consideration is 150 km. A comprehensive study was carried out on all parts of the infrastructure. It included analysis of the existing condition, technical design and preparation of tender documents.

     Upon completion of the entire project, a design speed of 100-120 ĸm/h will be achieved. The new features included: 25 ĸV/50 Nz electrification, new integrated dispatching system, modernisation of the safety equipment and telecommunications, the rail transport time will be reduced by about 25%. Sofia – Karlovo – Zimnica line is one of the busiest railway lines in Bulgaria.

Contacts

Phone

+359 879 83 73 83

Email

office@eurotransproject.com

Address

1202 Sofia , 108 "Tsar Samuil" Street

Contacts

Phone

+359 879 83 73 83

Email

office@eurotransproject.com

Address

1202 Sofia , 108 "Tsar Samuil" Street