Implementation period: 02.2011-12.2011
The following activities were carried out within the investment project:
- surveying of the site;
- preparation of detailed design for the following parts: Railway track, Drainage, Tunnels (tunnel No 23 with a length of 1,100 m, tunnel No 24 with a length of 788 m, and tunnel No 25 with a length of 623 m), Railway bridges (the bridge at km 215+452 with a length of 10.4 m and the bridge at km 216+355 with a length of 11 m), Safety equipment and telecommunications, Surveying, Catenary and power supply, Engineering and geological survey, Health and Safety Plan and Fire safety.
- preparation of technical specifications;
- carrying out author’s supervision;