<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>„ЕВРОТРАНСПРОЕКТ“ ООД</title>
	<atom:link href="https://eurotransproject.com/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://eurotransproject.com/en/home/</link>
	<description>Проектантски и консултантски услуги в областта на железопътния транспорт</description>
	<lastBuildDate>Tue, 09 Dec 2025 09:57:16 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://eurotransproject.com/wp-content/uploads/2019/11/logo_bkg-150x40.png</url>
	<title>„ЕВРОТРАНСПРОЕКТ“ ООД</title>
	<link>https://eurotransproject.com/en/home/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>„Изготвяне на инвестиционен проект, технически спецификации за строителство и изработване на ПУП за изграждане на железопътна връзка с летище Пловдив“</title>
		<link>https://eurotransproject.com/en/izgotvyane-na-investitsionen-proekt-tehnicheski-spetsifikatsii-za-stroitelstvo-i-izrabotvane-na-pup-za-izgrazhdane-na-zhelezopatna-vrazka-s-letishte-plovdiv-3/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 09 Dec 2025 08:59:55 +0000</pubDate>
				<category><![CDATA[Current projects]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2242</guid>

					<description><![CDATA[<p>ДОГОВОР №111667/31.07.2025 г.&#160;с предмет „Изготвяне на инвестиционен проект, технически спецификации за строителство и изработване на ПУП за изграждане на железопътна връзка с летище Пловдив“ ВЪЗЛОЖИТЕЛ:&#160;ДЪРЖАВНО ПРЕДПРИЯТИЕ „НАЦИОНАЛНА КОМПАНИЯ ЖЕЛЕЗОПЪТНА ИНФРАСТРУКТУРА“ ИЗПЪЛНИТЕЛ:&#160;„ЕВРОТРАНСПРОЕКТ“ ООД СТОЙНОСТ:&#160;4&#160;243&#160;750,00 лв. без ДДС ДАТА НА СТАРТИРАНЕ НА ДОГОВОРА:&#160;08.10.2025 г. СРОК ЗА ИЗПЪЛНЕНИЕ:&#160;465 календарни дни ОСНОВНИ ДЕЙНОСТИ&#160;ПО ДОГОВОР № 111667/31.07.2025 г.: Изпълнението на [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/izgotvyane-na-investitsionen-proekt-tehnicheski-spetsifikatsii-za-stroitelstvo-i-izrabotvane-na-pup-za-izgrazhdane-na-zhelezopatna-vrazka-s-letishte-plovdiv-3/">„Изготвяне на инвестиционен проект, технически спецификации за строителство и изработване на ПУП за изграждане на железопътна връзка с летище Пловдив“</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<figure class="wp-block-image size-full is-resized"><a href="https://www.eufunds.bg/bg/optti/term/393" target="_blank" rel=" noreferrer noopener"><img fetchpriority="high" decoding="async" width="631" height="133" src="https://eurotransproject.com/wp-content/uploads/2025/12/project.png" alt="" class="wp-image-2235" style="width:774px;height:auto" srcset="https://eurotransproject.com/wp-content/uploads/2025/12/project.png 631w, https://eurotransproject.com/wp-content/uploads/2025/12/project-300x63.png 300w" sizes="(max-width: 631px) 100vw, 631px" /></a></figure>



<p><strong>ДОГОВОР №111667/31.07.2025 г.</strong>&nbsp;с предмет „Изготвяне на инвестиционен проект, технически спецификации за строителство и изработване на ПУП за изграждане на железопътна връзка с летище Пловдив“</p>



<p><strong>ВЪЗЛОЖИТЕЛ:</strong>&nbsp;ДЪРЖАВНО ПРЕДПРИЯТИЕ „НАЦИОНАЛНА КОМПАНИЯ ЖЕЛЕЗОПЪТНА ИНФРАСТРУКТУРА“</p>



<p><strong>ИЗПЪЛНИТЕЛ:&nbsp;</strong>„ЕВРОТРАНСПРОЕКТ“ ООД</p>



<p><strong>СТОЙНОСТ:&nbsp;</strong>4&nbsp;243&nbsp;750,00 лв. без ДДС</p>



<p><strong>ДАТА НА СТАРТИРАНЕ НА ДОГОВОРА:</strong>&nbsp;08.10.2025 г.</p>



<p><strong>СРОК ЗА ИЗПЪЛНЕНИЕ:&nbsp;</strong>465 календарни дни</p>



<p><strong>ОСНОВНИ ДЕЙНОСТИ</strong><strong>&nbsp;ПО ДОГОВОР № 111</strong><strong>667/</strong><strong>31.</strong><strong>07.202</strong><strong>5 г.:</strong></p>



<ul class="wp-block-list">
<li>Изготвяне на инвестиционен проект, в т.ч. изготвяне и съгласуване на идеен и технически проект в пълен обем по всички необходими проектни части, свързани с изграждането на железопътна връзка с летище Пловдив;</li>



<li>Изработване и предаване на проекти за ПУП;</li>



<li>Изготвяне и предаване на проект за изменение на кадастралните карти в АГКК/СГКК;</li>



<li>Изготвяне и предаване на специализирана информация за нуждите на ГИС на ДП НКЖИ;</li>



<li>Изготвяне и предаване на технически спецификации за строителство;</li>



<li>Изготвяне и предаване на оценки на имотите частна собственост.</li>
</ul>



<p>Изпълнението на Договора е част от<strong>&nbsp;ПРОЕКТ</strong><strong>&nbsp;„</strong><strong>ТЕХНИЧЕСКА ПОМОЩ ЗА ИЗГРАЖДАНЕ НА ЖП ВРЪЗКА С ЛЕТИЩЕ ПЛОВДИВ“&nbsp;</strong>с Рег. №BG16FFPR001-4.001-0003<strong></strong></p>



<p><strong>СТОЙНОСТ НА ПРОЕКТА:</strong>&nbsp;5 472&nbsp;931,20 лв. без ДДС</p>



<p><strong>ФИНАНСИРАНЕ:</strong><strong></strong></p>



<ul class="wp-block-list">
<li>КОХЕЗИОНЕН ФОНД НА ЕС: 4 651 991,52 лв.</li>



<li>НАЦИОНАЛНО СЪФИНАНСИРАНЕ: 820 939,68 лв.</li>
</ul>



<p><strong>НАЧАЛНА ДАТА:&nbsp;</strong>01.01.2024 г.</p>



<p><strong>КРАЙНА ДАТА:</strong>&nbsp;31.07.2028 г.</p>



<p><strong>ОПИСАНИЕ НА ПРОЕКТА:</strong></p>



<p>Проектът включва изпълнението на подготвителните дейности, необходими за изграждане на жп връзка между гара Крумово и летище Пловдив:</p>



<ul class="wp-block-list">
<li>Изготвяне на инвестиционен проект и ПУП</li>



<li>Оценка на съответствието с изискванията на ЗУТ</li>



<li>Оценка на съответствието с изискванията на ТСОС</li>



<li>ОВОС</li>



<li>Теренни археологически проучвания</li>



<li>Отчуждителни процедури и придобиване на земя</li>



<li>Изготвяне на АРП и документи за кандидатстване за финансиране на строителството.</li>
</ul>



<p>Последващото изграждане на железопътната връзка ще допринесе за развитие на устойчива мултимодална градска мобилност и ще осигури бърз трансфер за пътниците, с което ще се повиши нивото на обслужване, отговарящо на изискванията за съвременно придвижване. Общата цел на инвестиционния проект е да бъде осъществена връзка на съществуващата инфраструктура на железопътен възел Пловдив с летище Пловдив, съгласно стандартите на ЕС и европейските транспортни политики, постигане на европейските изисквания за оперативна съвместимост и подобряване на безопасността при експлоатация на железопътната инфраструктура.</p>
<p>Материалът <a href="https://eurotransproject.com/en/izgotvyane-na-investitsionen-proekt-tehnicheski-spetsifikatsii-za-stroitelstvo-i-izrabotvane-na-pup-za-izgrazhdane-na-zhelezopatna-vrazka-s-letishte-plovdiv-3/">„Изготвяне на инвестиционен проект, технически спецификации за строителство и изработване на ПУП за изграждане на железопътна връзка с летище Пловдив“</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Preparation of technical documentation at study and conceptual design level for railway line of corridor VIII, section: Kichevo – border with the Republic of Albania”</title>
		<link>https://eurotransproject.com/en/preparation-of-technical-documentation-at-study-and-conceptual-design-level-for-railway-line-of-corridor-viii-section-kichevo-border-with-the-republic-of-albania/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 15 Feb 2023 08:22:15 +0000</pubDate>
				<category><![CDATA[Completed projects in Foreign countries]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2157</guid>

					<description><![CDATA[<p>Implementation period: 05.2009 – 06.2010 &#160;&#160;&#160;&#160;&#160;&#160;&#160; The railway line from Kicevo to the Albanian border is part of the Pan-European Corridor VIII, which connects Albania, North Macedonia and Bulgaria and is the only railway link from the Black Sea to the Adriatic Sea (from the port of Durres to the port of Varna). In North [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/preparation-of-technical-documentation-at-study-and-conceptual-design-level-for-railway-line-of-corridor-viii-section-kichevo-border-with-the-republic-of-albania/">“Preparation of technical documentation at study and conceptual design level for railway line of corridor VIII, section: Kichevo – border with the Republic of Albania”</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 05.2009 – 06.2010</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The railway line from Kicevo to the Albanian border is part of the Pan-European Corridor VIII, which connects Albania, North Macedonia and Bulgaria and is the only railway link from the Black Sea to the Adriatic Sea (from the port of Durres to the port of Varna). In North Macedonia, within the framework of Corridor VIII, there should be 309 km of railway line, of which 152 km have been built, from Kumanovo to Kicevo.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The corridor should be considered as a single project covering the entire infrastructure &#8211; port, rail, and road. The completion of Corridor VIII will result in better transport and economic connectivity between the East and the West, as well as in improved efficiency of transport services. The section from Kicevo to the border with the Republic of Albania connects underdeveloped regions and the construction of a railway line in the area will stimulate their economic growth.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The main activities implemented under the contract are:</p>



<p>Preparation of a feasibility study of the railway section, financial analysis and traffic forecasting studies;</p>



<p>Preparation of a conceptual design for the selected option for the railway line, including stations and turnouts, etc.</p>
<p>Материалът <a href="https://eurotransproject.com/en/preparation-of-technical-documentation-at-study-and-conceptual-design-level-for-railway-line-of-corridor-viii-section-kichevo-border-with-the-republic-of-albania/">“Preparation of technical documentation at study and conceptual design level for railway line of corridor VIII, section: Kichevo – border with the Republic of Albania”</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>&#8220;Preparation of spatial plans and technical design for the project &#8220;Doubling of sections of the railway line Krumovo &#8211; Svilengrad &#8211; Turkish border&#8221;</title>
		<link>https://eurotransproject.com/en/preparation-of-spatial-plans-and-technical-design-for-the-project-doubling-of-sections-of-the-railway-line-krumovo-svilengrad-turkish-border/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 15 Feb 2023 08:18:59 +0000</pubDate>
				<category><![CDATA[Design]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=1876</guid>

					<description><![CDATA[<p>Contracting Authority: State Enterprise National Railway Infrastructure Company With the implementation of the investment project for doubling of sections along Plovdiv &#8211; Svilengrad railway line, as part of the First railway line (of the “high speed” category): Kalotina-West (state border with the Republic of Serbia) &#8211; Sofia &#8211; Plovdiv &#8211; Dimitrovgrad &#8211; Svilengrad (state borders [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/preparation-of-spatial-plans-and-technical-design-for-the-project-doubling-of-sections-of-the-railway-line-krumovo-svilengrad-turkish-border/">&#8220;Preparation of spatial plans and technical design for the project &#8220;Doubling of sections of the railway line Krumovo &#8211; Svilengrad &#8211; Turkish border&#8221;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Contracting Authority: State Enterprise National Railway Infrastructure Company</p>



<p>With the implementation of the investment project for doubling of sections along Plovdiv &#8211; Svilengrad railway line, as part of the First railway line (of the “high speed” category): Kalotina-West (state border with the Republic of Serbia) &#8211; Sofia &#8211; Plovdiv &#8211; Dimitrovgrad &#8211; Svilengrad (state borders with the Republic of Greece and the Republic of Turkey), the capacity of the railway line will be increased to accommodate the growing traffic, attract more international cargo and promote passenger transport by rail. Doubling the capacity of the railway line will reduce operating costs and ensure greater safety for train traffic. Funding for the project is provided by the Connecting Europe Facility (CEF). The objective of the technical assistance project, within the scope of the railway line Krumovo-Svilengrad- border with the Republic of Turkey, is to optimise the results of the previous and related developments, by updating the parameters and construction values and achieving project readiness (technical design, coordination, approvals, permits, etc.) for the railway section doubling.</p>



<p>Project implementation will result in:</p>



<ul class="wp-block-list">
<li>Increased competition in the transport market through improved quality of rail services;</li>



<li>Increase throughput;</li>



<li>Maintaining the railway track parameters achieved to ensure the design speed of 160 km/h;</li>
</ul>



<figure class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="646" data-id="1451" src="https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn1-1024x646.png" alt="" class="wp-image-1451" srcset="https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn1-1024x646.png 1024w, https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn1-300x189.png 300w, https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn1-768x485.png 768w, https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn1.png 1280w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="450" data-id="1452" src="https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn2-1024x450.jpg" alt="" class="wp-image-1452" srcset="https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn2-1024x450.jpg 1024w, https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn2-300x132.jpg 300w, https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn2-768x337.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn2-1536x674.jpg 1536w, https://eurotransproject.com/wp-content/uploads/2022/02/proekt№2_sn2.jpg 1920w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>
</figure>
<p>Материалът <a href="https://eurotransproject.com/en/preparation-of-spatial-plans-and-technical-design-for-the-project-doubling-of-sections-of-the-railway-line-krumovo-svilengrad-turkish-border/">&#8220;Preparation of spatial plans and technical design for the project &#8220;Doubling of sections of the railway line Krumovo &#8211; Svilengrad &#8211; Turkish border&#8221;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>&#8220;Pre-investment study for the project: doubling of the Karnobat-Sindel railway line&#8221;</title>
		<link>https://eurotransproject.com/en/pre-investment-study-for-the-project-doubling-of-the-karnobat-sindel-railway-line/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 15 Feb 2023 08:17:46 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=1874</guid>

					<description><![CDATA[<p>Implementation period: 04.2008-02.2009 &#160;&#160;&#160;&#160;&#160;&#160; &#160;Karnobat &#8211; Sindel railway line is part of the Pan-European Corridor No 8, the alignment is well prepared in terms of design. Together with the rehabilitation of Pyce &#8211; Varna railway line, the section to Karnobat can provide a faster connection to the south of the country. This, in turn, is [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/pre-investment-study-for-the-project-doubling-of-the-karnobat-sindel-railway-line/">&#8220;Pre-investment study for the project: doubling of the Karnobat-Sindel railway line&#8221;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 04.2008-02.2009</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;Karnobat &#8211; Sindel railway line is part of the Pan-European Corridor No 8, the alignment is well prepared in terms of design.</p>



<p>Together with the rehabilitation of Pyce &#8211; Varna railway line, the section to Karnobat can provide a faster connection to the south of the country. This, in turn, is a prerequisite for attracting additional cargo in the event of a tunnel under the Bosphorus. The construction of the railway line between Karnobat and Sindel started in 1981.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The contract was executed in the following stages:</p>



<p>Stage I &#8211; Preparation of a methodology and organisational programme for the implementation of the project, including a schedule for the implementation of the individual stages and phases.</p>



<p>Stage II &#8211; Preparation of a technical status analysis of the existing project.</p>



<p>Stage III &#8211; Preparation of a priority design programme by sections.</p>



<p>Stage IV &#8211; Preparation of a Cost-Benefit Analysis and Financial Efficiency Analysis of the project.</p>



<p>Stage V &#8211; Assessment of the feasibility of using PPPs.</p>



<p>Stage VI – Detailed designs by sections and elements of the railway track.</p>



<p>Stage VII &#8211; Preparation of the Final Report.</p>



<p>&nbsp; The total length of the section is 123 km. The study and design was comprehensive and included all parts of the infrastructure.</p>


<style>.uid-3cf00ad3100d0b8f  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-3cf00ad3100d0b8f  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-3cf00ad3100d0b8f" data-gt3pg-block="grid" data-index="1" class="gt3-photo-gallery-pro--isotope_gallery uid-3cf00ad3100d0b8f gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-3cf00ad3100d0b8f&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 13 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1654,&quot;width&quot;:1181,&quot;height&quot;:896},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 13 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1655,&quot;width&quot;:1151,&quot;height&quot;:493}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:1}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 13 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1654,&quot;width&quot;:1181,&quot;height&quot;:896},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 13 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1655,&quot;width&quot;:1151,&quot;height&quot;:493}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-768x583.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="583" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-768x583.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-768x583.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-300x228.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.1-768x583.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAA6CAYAAAD1LtTJAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAKElEQVR42u3BMQEAAADCoPVPbQwfoAAAAAAAAAAAAAAAAAAAAAAA+BhGAgABzEAFTQAAAABJRU5ErkJggg==" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-768x329.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="329" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-768x329.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-768x329.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-300x128.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-13-sn.2-768x329.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAhCAYAAACcPyaRAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAIUlEQVRo3u3BMQEAAADCoPVPbQ0PoAAAAAAAAAAAAIALAyfVAAHgjDmiAAAAAElFTkSuQmCC" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-3cf00ad3100d0b8f">{"id":1,"uid":"uid-3cf00ad3100d0b8f","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1.jpg","title":"proekt 13 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1654,"width":1181,"height":896},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2.jpg","title":"proekt 13 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1655,"width":1151,"height":493}],"lightbox":{"enable":true,"options":{"instance":1}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1.jpg","title":"proekt 13 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1654,"width":1181,"height":896},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2.jpg","title":"proekt 13 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-13-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1655,"width":1151,"height":493}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/pre-investment-study-for-the-project-doubling-of-the-karnobat-sindel-railway-line/">&#8220;Pre-investment study for the project: doubling of the Karnobat-Sindel railway line&#8221;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>&#8220;Compliance assessment and construction supervision during construction and coordination of contracts under the project &#8220;Rehabilitation of the railway line Plovdiv &#8211; Burgas, Phase 2&#8221;</title>
		<link>https://eurotransproject.com/en/compliance-assessment-and-construction-supervision-during-construction-and-coordination-of-contracts-under-the-project-rehabilitation-of-the-railway-line-plovdiv-burgas-phase-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 15 Feb 2023 08:15:12 +0000</pubDate>
				<category><![CDATA[Construction supervision]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=1871</guid>

					<description><![CDATA[<p>Contracting Authority: State Enterprise National Railway Infrastructure Company Plovdiv-Burgas railway line is a priority line in the national railway system and its rehabilitation will contribute to improving the quality of services and reducing transport costs. The higher speed and better quality of services will help increase the competitiveness of rail compared to other modes of [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/compliance-assessment-and-construction-supervision-during-construction-and-coordination-of-contracts-under-the-project-rehabilitation-of-the-railway-line-plovdiv-burgas-phase-2/">&#8220;Compliance assessment and construction supervision during construction and coordination of contracts under the project &#8220;Rehabilitation of the railway line Plovdiv &#8211; Burgas, Phase 2&#8221;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Contracting Authority: State Enterprise National Railway Infrastructure Company</p>



<p>Plovdiv-Burgas railway line is a priority line in the national railway system and its rehabilitation will contribute to improving the quality of services and reducing transport costs. The higher speed and better quality of services will help increase the competitiveness of rail compared to other modes of transport.</p>



<p>The contract involves carrying out conformity assessment, contract coordination and construction supervision for the following lots/contracts:</p>



<ol class="wp-block-list" type="1">
<li>Design and construction of signalling and telecommunication systems along Plovdiv-Burgas railway line &#8211; construction works for: signalling in 18 stations; ETCS, level 1 train control system; integrated dispatching system in Manole-Burgas section; GSM-R train communication system; laying of fibre optic cable;</li>



<li>Construction of overpasses/underpasses for Plovdiv-Burgas railway line in place of existing level crossings &#8211; removal of level crossings and construction of overpasses;</li>



<li>Construction of a protective forest belt in Chernograd-Aytos open track section to protect the railway track from adverse weather conditions;</li>



<li>Rehabilitation of Skutare-Orizovo railway section -renewal of the railway track, reconstruction of bridges, renewal of the existing catenary and signalling in stations;</li>



<li>Modernisation of Orizovo &#8211; Mihailovo railway section &#8211; renewal and construction of railway track and catenary, reconstruction of bridges, construction of a tunnel, modernisation of Chirpan traction substation, removal of level crossings, construction of overpasses and renewal of signalling in stations;</li>



<li>Modernisation of Yambol &#8211; Zimnitsa railway section, at Zavoy station &#8211; construction of railway track including at Zavoy station, construction of bridges, renewal and construction of new catenary;</li>



<li>Reconstruction of the switch layout at Zimnitsa station;</li>



<li>Rehabilitation of the catenary at Zimnitsa and Straldzha stations &#8211; renewal of the railway track, reconstruction of the track layout at Zimnitsa station, renewal of the catenary at Zimnitsa and Straldzha stations, renewal of signalling at Zimnitsa station;</li>



<li>Rehabilitation of Straldzha &#8211; Tserkovski railway section &#8211; renewal of railway track.</li>
</ol>



<p>The main objective of the project is to achieve the characteristics of the railway infrastructure in accordance with Regulation (EC) No 1315/2013 on the Trans-European Transport Network (TEN-T), as well as the demand of transport service users for efficient transport. The project will also improve the quality of Plovdiv-Burgas railway line and will attract greater traffic to rail transport.</p>
<p>Материалът <a href="https://eurotransproject.com/en/compliance-assessment-and-construction-supervision-during-construction-and-coordination-of-contracts-under-the-project-rehabilitation-of-the-railway-line-plovdiv-burgas-phase-2/">&#8220;Compliance assessment and construction supervision during construction and coordination of contracts under the project &#8220;Rehabilitation of the railway line Plovdiv &#8211; Burgas, Phase 2&#8221;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Macedonian Railways: Corridor X &#8211; Preparation of design and implementation of works under the project for railway sections of Corridor X, including Xd branch”</title>
		<link>https://eurotransproject.com/en/macedonian-railways-corridor-x-preparation-of-design-and-implementation-of-works-under-the-project-for-railway-sections-of-corridor-x-including-xd-branch-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 07 Jun 2022 08:24:09 +0000</pubDate>
				<category><![CDATA[Completed projects in Foreign countries]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2119</guid>

					<description><![CDATA[<p>&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160; Implementation period: 05.2012 – 08.2014 &#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160; The railway Corridor X through the Republic of North Macedonia (215 km) operates as a single-track electrified railway line. The project is prepared to meet the demand of better railway connections along the international corridor in order to increase its capacity and for better connectivity of North Macedonia [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/macedonian-railways-corridor-x-preparation-of-design-and-implementation-of-works-under-the-project-for-railway-sections-of-corridor-x-including-xd-branch-2/">&lt;strong&gt;“Macedonian Railways: Corridor X &#8211; Preparation of design and implementation of works under the project for railway sections of Corridor X, including Xd branch”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Implementation period: 05.2012 – 08.2014</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The railway Corridor X through the Republic of North Macedonia (215 km) operates as a single-track electrified railway line. The project is prepared to meet the demand of better railway connections along the international corridor in order to increase its capacity and for better connectivity of North Macedonia with the European Union members and neighbouring countries thus being a prerequisite for sustainable development of the railway infrastructure along Corridor X and its Xd branch.</p>



<p>The main activities implemented under the contract are:</p>



<p>Preparation of feasibility study, detailed design, financial analysis, and environmental impact assessment for the reconstruction of the section Bitola &#8211; Kremenica (16 km) as part of the Xd branch of the Corridor;</p>



<p>Preparation of feasibility study, preliminary design and detailed design, financial analysis, and environmental impact assessment for the reconstruction of the section Kumanovo &#8211; Deliadrovci (14 km);</p>



<p>Preparation of feasibility study, financial analysis and environmental impact assessment for the reconstruction of the section Drachevo &#8211; Veles (35 km).</p>
<p>Материалът <a href="https://eurotransproject.com/en/macedonian-railways-corridor-x-preparation-of-design-and-implementation-of-works-under-the-project-for-railway-sections-of-corridor-x-including-xd-branch-2/">&lt;strong&gt;“Macedonian Railways: Corridor X &#8211; Preparation of design and implementation of works under the project for railway sections of Corridor X, including Xd branch”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Macedonian Railways: Corridor VIII &#8211; Eastern Section, Detailed Design and Technical Assistance for Kumanovo &#8211; Beljakovce Section”</title>
		<link>https://eurotransproject.com/en/macedonian-railways-corridor-viii-eastern-section-detailed-design-and-technical-assistance-for-kumanovo-beljakovce-section/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 07 Jun 2022 08:18:01 +0000</pubDate>
				<category><![CDATA[Completed projects in Foreign countries]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2121</guid>

					<description><![CDATA[<p>&#160;&#160;&#160; Implementation period: 03.2012 – 10.2013 &#160;&#160;&#160; The construction of the railway line between the Republic of North Macedonia and Bulgaria, i.e. from Kumanovo to the border with Bulgaria and Deve Bair &#8211; Gyeshevo Border Checkpoint, has been and still is an ongoing topic in the relations between the two countries. The construction of Corridor [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/macedonian-railways-corridor-viii-eastern-section-detailed-design-and-technical-assistance-for-kumanovo-beljakovce-section/">&lt;strong&gt;“Macedonian Railways: Corridor VIII &#8211; Eastern Section, Detailed Design and Technical Assistance for Kumanovo &#8211; Beljakovce Section”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>&nbsp;&nbsp;&nbsp; Implementation period: 03.2012 – 10.2013</p>



<p>&nbsp;&nbsp;&nbsp; The construction of the railway line between the Republic of North Macedonia and Bulgaria, i.e. from Kumanovo to the border with Bulgaria and Deve Bair &#8211; Gyeshevo Border Checkpoint, has been and still is an ongoing topic in the relations between the two countries. The construction of Corridor VIII railway line will be a key capital project in the Republic of North Macedonia. This railway line is indispensable not only for passenger transport, but also for freight transport, because currently freight transport is 90% and passenger transport only 10% of the total transport volume along Corridor VIII.</p>



<p>&nbsp;&nbsp;&nbsp; The railway line, part of Corridor 8, from Kumanovo via Beljakovce and Kriva Palanka to Deve Bair (the border with the Republic of Bulgaria) is 88.2 km long in total and is divided into three sections. The first part is from Kumanovo to Beljakovce with a length of 30.8 km, the second part is from Beljakovce to Kriva Palanka with a length of 34 km and the shortest but the hardest part from Kriva Palanka to the border checkpoint of Deve Bair &#8211; Gyeshevo is 23.4 km long.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The prepared design aims to facilitate the rehabilitation activities of the first section, from Kumanovo to Beljakovce, which was in operation until 1996. The section starts at the northern end of Kumanovo station up to and including Beljakovce station.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The main activities carried out under the contract are:</p>



<p>Preparation of detailed design for the following parts: railway track, drainage, signalling and telecommunications, etc.;</p>



<p>Preparation of Technical specifications and bill of quantities for the construction works;</p>



<p>Preparation of investment cost estimates;</p>



<p>Preparation of tender documents for the selection of contractor for the construction works.</p>
<p>Материалът <a href="https://eurotransproject.com/en/macedonian-railways-corridor-viii-eastern-section-detailed-design-and-technical-assistance-for-kumanovo-beljakovce-section/">&lt;strong&gt;“Macedonian Railways: Corridor VIII &#8211; Eastern Section, Detailed Design and Technical Assistance for Kumanovo &#8211; Beljakovce Section”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Increasing the throughput capacity by improving the parameters of the railway track and increasing the design speeds of Sofia-Karlovo-Zimnitsa railway line, Sofia-Karlovo section”</title>
		<link>https://eurotransproject.com/en/increasing-the-throughput-capacity-by-improving-the-parameters-of-the-railway-track-and-increasing-the-design-speeds-of-sofia-karlovo-zimnitsa-railway-line-sofia-karlovo-section/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:38:14 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2083</guid>

					<description><![CDATA[<p>Implementation period: 12.2006 – 09.2007 &#160;&#160;&#160;&#160; The length of the section under consideration is 150 km. A comprehensive study was carried out on all parts of the infrastructure. It included analysis of the existing condition, technical design and preparation of tender documents. &#160;&#160;&#160;&#160; Upon completion of the entire project, a design speed of 100-120 ĸm/h [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/increasing-the-throughput-capacity-by-improving-the-parameters-of-the-railway-track-and-increasing-the-design-speeds-of-sofia-karlovo-zimnitsa-railway-line-sofia-karlovo-section/">&lt;strong&gt;“Increasing the throughput capacity by improving the parameters of the railway track and increasing the design speeds of Sofia-Karlovo-Zimnitsa railway line, Sofia-Karlovo section”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 12.2006 – 09.2007</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; The length of the section under consideration is 150 km. A comprehensive study was carried out on all parts of the infrastructure. It included analysis of the existing condition, technical design and preparation of tender documents.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; Upon completion of the entire project, a design speed of 100-120 ĸm/h will be achieved. The new features included: 25 ĸV/50 Nz electrification, new integrated dispatching system, modernisation of the safety equipment and telecommunications, the rail transport time will be reduced by about 25%. Sofia &#8211; Karlovo &#8211; Zimnica line is one of the busiest railway lines in Bulgaria.</p>


<style>.uid-4569e1fce3b59808  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-4569e1fce3b59808  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-4569e1fce3b59808" data-gt3pg-block="grid" data-index="2" class="gt3-photo-gallery-pro--isotope_gallery uid-4569e1fce3b59808 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-4569e1fce3b59808&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 14 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1658,&quot;width&quot;:891,&quot;height&quot;:681},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 14 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1659,&quot;width&quot;:1920,&quot;height&quot;:563}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:2}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 14 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1658,&quot;width&quot;:891,&quot;height&quot;:681},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 14 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1659,&quot;width&quot;:1920,&quot;height&quot;:563}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-768x587.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="587" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-768x587.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-768x587.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-300x229.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.1-768x587.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAA6CAYAAAD1LtTJAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAKElEQVR42u3BMQEAAADCoPVPbQwfoAAAAAAAAAAAAAAAAAAAAAAA+BhGAgABzEAFTQAAAABJRU5ErkJggg==" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-768x225.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="225" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-768x225.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-768x225.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-300x88.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-14-sn.2-768x225.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAWCAYAAACFQBGEAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAHUlEQVRYw+3BMQEAAADCoPVPbQo/oAAAAAAAAOBlGo4AARvkOzMAAAAASUVORK5CYII=" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-4569e1fce3b59808">{"id":1,"uid":"uid-4569e1fce3b59808","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1.jpg","title":"proekt 14 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1658,"width":891,"height":681},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2.jpg","title":"proekt 14 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1659,"width":1920,"height":563}],"lightbox":{"enable":true,"options":{"instance":2}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1.jpg","title":"proekt 14 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1658,"width":891,"height":681},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2.jpg","title":"proekt 14 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-14-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1659,"width":1920,"height":563}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/increasing-the-throughput-capacity-by-improving-the-parameters-of-the-railway-track-and-increasing-the-design-speeds-of-sofia-karlovo-zimnitsa-railway-line-sofia-karlovo-section/">&lt;strong&gt;“Increasing the throughput capacity by improving the parameters of the railway track and increasing the design speeds of Sofia-Karlovo-Zimnitsa railway line, Sofia-Karlovo section”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Technical assistance for the development of Sofia Railway Junction”</title>
		<link>https://eurotransproject.com/en/technical-assistance-for-the-development-of-sofia-railway-junction/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:34:50 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2090</guid>

					<description><![CDATA[<p>Implementation period: 11.2009-12.2010 &#160;&#160;&#160;&#160;&#160;&#160; Sofia Railway Junction is located on the Orient/East-Med Corridor of the main TEN-T network, making it the largest rail transport hub in the country. The activities carried out for Sofia Railway Junction include preparation of technical designs and detailed development plans (DDP) for modernisation and rehabilitation of individual sections of Sofia [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-development-of-sofia-railway-junction/">&lt;strong&gt;“Technical assistance for the development of Sofia Railway Junction”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 11.2009-12.2010</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sofia Railway Junction is located on the Orient/East-Med Corridor of the main TEN-T network, making it the largest rail transport hub in the country. The activities carried out for Sofia Railway Junction include preparation of technical designs and detailed development plans (DDP) for modernisation and rehabilitation of individual sections of Sofia Railway Junction, reconstruction of existing and construction of new station buildings, halts and buildings within its scope.</p>



<p>&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Sofia Railway Junction covers the sections between the stations Voluyak &#8211; Kazichene, Kazichene &#8211; Stolnik, Zaharna Fabrika &#8211; Sofia &#8211; Kurilo and Birimirtsi station. Under the project “Instrument for preparation of railway projects for the Trans-European Transport Network” technical designs and DDP were prepared for the following stations and the railway sections between them: Voluyak, Sofia Central Railway Station, Poduyane, Poduyane Shunting Yard, Iskar, Kazichene, Stolnik, Sofia -north, Iliantsi, Birimirtsi and the open track section Kazichene &#8211; Elin Pelin. The only part of Sofia Railway Junction that is included in Sofia &#8211; Elin Pelin railway line modernisation project is the section of the same name, which is currently in the stage of implementation. Essentially, within the framework of Sofia Railway Junction development project, a third railway track will be designed in the section from Volyak station to Elin Pelin station, which will be dedicated to freight traffic. In addition to Sofia &#8211; Volyuyak project, the switch layout in Sofia Central Railway Station will be optimised and reconstructed. Following a direct application, the European Commission has approved funding for the implementation of several new projects under the Connecting Europe Facility (CEF). Among them is the project for the modernisation of Sofia-Volujak railway section, which is part of Sofia Railway Junction.</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The project is funded by the ISPA/CF programme, Regulation 1164/94 with the funds saved under the Financing Memorandum “Technical assistance for the Modernisation of Trans-European Transport Network (TEN-T) railway lines in Bulgaria”. Its implementation provided the necessary project readiness to apply for funding and implement construction works under the Operational Programme on Transport.</p>


<style>.uid-12b08924fc226bb7  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-12b08924fc226bb7  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-12b08924fc226bb7" data-gt3pg-block="grid" data-index="3" class="gt3-photo-gallery-pro--isotope_gallery uid-12b08924fc226bb7 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-12b08924fc226bb7&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 12 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1651,&quot;width&quot;:1178,&quot;height&quot;:622}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:3}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 12 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1651,&quot;width&quot;:1178,&quot;height&quot;:622}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-768x406.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="406" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-768x406.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-768x406.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-300x158.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-12-sn.1-768x406.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAoCAYAAAC7MHdZAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAIklEQVRo3u3BAQEAAACCIP+vbkhAAQAAAAAAAAAAAAAALwYwSAABNsr1wQAAAABJRU5ErkJggg==" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-12b08924fc226bb7">{"id":1,"uid":"uid-12b08924fc226bb7","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1.jpg","title":"proekt 12 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1651,"width":1178,"height":622}],"lightbox":{"enable":true,"options":{"instance":3}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1.jpg","title":"proekt 12 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-12-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1651,"width":1178,"height":622}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-development-of-sofia-railway-junction/">&lt;strong&gt;“Technical assistance for the development of Sofia Railway Junction”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Technical assistance for the restoration of the design parameters of Ruse &#8211; Varna railway line”</title>
		<link>https://eurotransproject.com/en/technical-assistance-for-the-restoration-of-the-design-parameters-of-ruse-varna-railway-line/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 10:33:10 +0000</pubDate>
				<category><![CDATA[Completed projects in Bulgaria]]></category>
		<guid isPermaLink="false">https://eurotransproject.com/?p=2092</guid>

					<description><![CDATA[<p>Implementation period: 02.2009-09.2011 &#160;&#160;&#160;&#160; The main objective of the project is to provide technical assistance to Bulgaria for the development of the railway infrastructure in line with the European Union policy. It will help fulfil the commitments made for the sustainable development of the Trans-European Transport Networks (TEN-T). &#160;&#160;&#160; Ruse &#8211; Varna railway section is [&#8230;]</p>
<p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-restoration-of-the-design-parameters-of-ruse-varna-railway-line/">&lt;strong&gt;“Technical assistance for the restoration of the design parameters of Ruse &#8211; Varna railway line”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Implementation period: 02.2009-09.2011</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp; The main objective of the project is to provide technical assistance to Bulgaria for the development of the railway infrastructure in line with the European Union policy. It will help fulfil the commitments made for the sustainable development of the Trans-European Transport Networks (TEN-T).</p>



<p>&nbsp;&nbsp;&nbsp; Ruse &#8211; Varna railway section is electrified and has an approximate length of 232 km. It consists of two sections: Ruse &#8211; Kaspichan &#8211; main railway line No 9 &#8211; first category, 97 km long, single-track electrified section; and Kaspichan &#8211; Varna, 135 km long, double-track electrified section, which is part of main railway line No 2 Sofia-Mezdra-Gorna Oryahovitsa-Kaspichan-Sindel-Varna. The current state of the infrastructure facilities on this railway section obstructs regional rail transport. Thus, Ruse-Varna railway section can be defined as a bottleneck, as the estimated average speed is 66.5 km/h for passenger trains and 62 km/h for freight trains, at an average design speed for the section of 79.3 km/h. The railway line is an important section that provides a link between the ports of Ruse and Varna. The developed preliminary and technical designs for the rehabilitation of the railway line enable the project to be implemented and the railway sections Ruse-Kaspichan and Kaspichan-Varna to be brought in line with the requirements of the Technical Specifications for Interoperability, if a contractor is selected for the construction works.</p>


<style>.uid-4db5410d72863403  .gt3pg-isotope-item {
	padding-right: 20px;
	padding-bottom: 20px;
}
.uid-4db5410d72863403  .gallery-isotope-wrapper {
	margin-right: -20px;
	margin-bottom: -20px;
}
</style><div id="uid-4db5410d72863403" data-gt3pg-block="grid" data-index="4" class="gt3-photo-gallery-pro--isotope_gallery uid-4db5410d72863403 gt3pg-pro--wrapper gt3pg-pro--grid ">		<div data-cols="3" data-cols-tablet="3" data-cols-mobile="2" class="gt3pg-isotope-gallery columns-3 hover-default gallery-grid  corner-standard rectangle-3x2" data-settings="{&quot;id&quot;:1,&quot;uid&quot;:&quot;uid-4db5410d72863403&quot;,&quot;grid_type&quot;:&quot;rectangle-3x2&quot;,&quot;modules&quot;:[&quot;Lightbox&quot;],&quot;lightboxArray&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 11 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1647,&quot;width&quot;:1230,&quot;height&quot;:924},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 11 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1648,&quot;width&quot;:1814,&quot;height&quot;:1080}],&quot;lightbox&quot;:{&quot;enable&quot;:true,&quot;options&quot;:{&quot;instance&quot;:4}},&quot;items&quot;:[{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1.jpg&quot;,&quot;title&quot;:&quot;proekt 11 sn.1&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1647,&quot;width&quot;:1230,&quot;height&quot;:924},{&quot;href&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2.jpg&quot;,&quot;title&quot;:&quot;proekt 11 sn.2&quot;,&quot;thumbnail&quot;:&quot;https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2-150x150.jpg&quot;,&quot;description&quot;:&quot;&quot;,&quot;is_video&quot;:0,&quot;image_id&quot;:1648,&quot;width&quot;:1814,&quot;height&quot;:1080}]}">
			<div class="gallery-isotope-wrapper">
				<div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-768x577.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="577" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-768x577.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-768x577.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-300x225.jpg 300w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-600x450.jpg 600w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.1-768x577.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAA5CAYAAABzuqZnAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAKElEQVR42u3BMQEAAADCoPVPbQlPoAAAAAAAAAAAAAAAAAAAAAAADgZEzQABzhJDggAAAABJRU5ErkJggg==" /></div></a></div></div><div class="gt3pg-isotope-item loading " ><div class="isotope_item-wrapper"><a href="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-768x457.jpg" class="gt3pg-lightbox" data-elementor-open-lightbox="no"><div class="img-wrapper "><img loading="lazy" decoding="async" width="768" height="457" src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-768x457.jpg" class="skip-lazy gt3-lazy-image" alt="" data-lazy-srcset="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-768x457.jpg 768w, https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-300x179.jpg 300w" data-lazy-sizes="(max-width: 768px) 100vw, 768px" data-lazy-src="https://eurotransproject.com/wp-content/uploads/2022/06/proekt-11-sn.2-768x457.jpg?is-pending-load=1" srcset="data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAE0AAAAtCAYAAADr/ebqAAAACXBIWXMAAA7EAAAOxAGVKw4bAAAAI0lEQVRo3u3BAQEAAACCIP+vbkhAAQAAAAAAAAAAAAAAAHBhNlEAAVcoBHMAAAAASUVORK5CYII=" /></div></a></div></div>			</div>
		</div>
		<script type="application/json" id="settings--uid-4db5410d72863403">{"id":1,"uid":"uid-4db5410d72863403","grid_type":"rectangle-3x2","modules":["Lightbox"],"lightboxArray":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1.jpg","title":"proekt 11 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1647,"width":1230,"height":924},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2.jpg","title":"proekt 11 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1648,"width":1814,"height":1080}],"lightbox":{"enable":true,"options":{"instance":4}},"items":[{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1.jpg","title":"proekt 11 sn.1","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.1-150x150.jpg","description":"","is_video":0,"image_id":1647,"width":1230,"height":924},{"href":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2.jpg","title":"proekt 11 sn.2","thumbnail":"https:\/\/eurotransproject.com\/wp-content\/uploads\/2022\/06\/proekt-11-sn.2-150x150.jpg","description":"","is_video":0,"image_id":1648,"width":1814,"height":1080}]}</script>
		</div><p>Материалът <a href="https://eurotransproject.com/en/technical-assistance-for-the-restoration-of-the-design-parameters-of-ruse-varna-railway-line/">&lt;strong&gt;“Technical assistance for the restoration of the design parameters of Ruse &#8211; Varna railway line”&lt;/strong&gt;</a> е публикуван за пръв път на <a href="https://eurotransproject.com/en/home/">„ЕВРОТРАНСПРОЕКТ“ ООД</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
